2017年3月31日起,船舶進(jìn)入巴拿馬運(yùn)河,船舶主機(jī),輔機(jī),鍋爐是需要愛(ài)更換輕油的。 on 31st March 2017, vessels need to complete the switch(changeover) from heavy fuel oil (residual fuel) to light fuel (distillate fuel) to be used for their propulsion engines, auxiliary engines, and boilers, prior to arriving in Panama Canal Waters. In this regard, the Panama Canal Authority issued “ADV15-2017 Modification to Fuel Requirements in Panama Canal Waters This advisory has mitigated the requirement of N-1-2017, following customer requests, and vessels should comply with these changes accordingly. A summary of the changes appears below. Summary:
2. In the above situation, vessels shall change over to Light Oil for the auxiliary machinery at least 2 hours prior to the scheduled P.O.B. for her Canal transit 在船舶進(jìn)入巴拿馬運(yùn)河上引水前2小時(shí),船舶輔機(jī)(發(fā)電機(jī)和鍋爐)需更換輕油的。 3. It is unnecessary to switch to Light Oil for all machinery (including Main Engine), for vessels that arrive at Canal waters with the sole intention of visiting either the Pacific or Atlantic port terminals or anchor at the Pacific or Atlantic Anchorages and will not transit. 對(duì)于靠泊在巴拿馬運(yùn)河太平洋或大西洋兩邊的港口或在巴拿馬運(yùn)河兩端拋錨,是不需要更換輕油的。 4. All vessels that arrive with the intention of transiting, shall record the fuel changeover in their engine room logbook and/or fuel oil changeover logbook. 船舶進(jìn)入巴拿馬運(yùn)河,是必須在機(jī)艙的輪機(jī)日志和燃油切換記錄本上記錄換油的操作。 附:巴拿馬運(yùn)河的通告如下 AUTORIDAD DEL CANAL DE PANAMá EXECUTIVE VICE PRESIDENCY FOR OPERATIONS 3654-A (OPXI) V. 4-2-2015 ADVISORY TO SHIPPING No. A-15-2017 April 19, 2017 TO : All Shipping Agents, Owners, and Operators SUBJECT: Modification to Fuel Requirements in Panama Canal Waters OP Notice to Shipping N-1-2017, “Vessel Requirements”, Section 29.a, requires that vessels complete the switch (changeover) from heavy fuel oil (residual fuel) to light fuel (distillate fuel) that will be used for their propulsion engines, auxiliary engines, boilers and other ancillary equipment, prior to arriving at Panama Canal waters. This requirement will resolve operational issues, as well as avoid any negative impact on the health of Panama Canal Authority (ACP) personnel, caused by the use of HFO while in Canal waters. As a result of customers’ requests, and after evaluating the possible impact a modification to this requirement may have on our operations, to include health issues for ACP personnel, the above listed requirement has been modified as follows: · Vessels with intentions to transit that, prior to transit, need to anchor at the Pacific or Atlantic Anchorages, or vessels that plan to call at the Pacific or Atlantic port terminals, will be permitted to use heavy (residual) fuel to operate their auxiliary engines, boilers and other ancillary equipment during their stay at the anchorage or at the berth. However, these vessels will be required to perform a changeover from heavy (residual) to light (distillate) fuel that is used to operate their propulsion engines prior to entering Canal waters. · Vessels that opt to burn heavy (residual) fuel in their auxiliary engines, boilers and other ancillary equipment, as described in the above paragraph, shall change over to light (distillate) fuel operation, at least two (2) hours prior to the scheduled pilot time for their Canal transit. Vessels will be deemed ready for Canal transit only when the changeover to light fuel has been completed and are operating only on distillate fuel. · Vessels that arrive at Canal waters with the sole intention to visit either the Pacific or Atlantic port terminal and will not transit, may be allowed to proceed to and from the port terminal on heavy fuel, including the main propulsion engines. These vessels will not be subject to the fuel changeover requirement stated in Notice to Shipping N-1-2017. ADVISORIES ARE AVAILABLE AT http://www.
All vessels that arrive with the intention of transiting, shall record the fuel changeover in their engine room logbook and/or fuel oil changeover logbook. The logbook entries shall specify the date and time of commencement and ending of the changeover from heavy (residual) fuel to light (distillate) fuel, as well as the sulfur content of fuels. As always, the Panama Canal appreciates your comments, and looks forward to continue serving you in the future. ORIGINAL SIGNED Esteban G. Sáenz Executive Vice President for Operations 投稿 ,建議,合作:35628559@qq.com, 微信:BSMCHINA168 |
|
來(lái)自: 風(fēng)平浪靜rht > 《文件夾1》