小男孩‘自慰网亚洲一区二区,亚洲一级在线播放毛片,亚洲中文字幕av每天更新,黄aⅴ永久免费无码,91成人午夜在线精品,色网站免费在线观看,亚洲欧洲wwwww在线观看

分享

裝卸時(shí)間事實(shí)記錄(SOF)

 學(xué)海無涯888gy 2011-12-02

一、 船舶抵達(dá)

1. 抵達(dá)引水錨地Anchored at Pilot anchorage. Arrived at Pilot anchorage

2. 抵達(dá)檢疫錨地Anchored at Quarantine anchorage

3. 等候引水Awaiting pilot, Waiting for pilot

4. 等候聯(lián)檢Awaiting Joint Inspection

5. 檢疫通過Free Pratique granted

6. 進(jìn)行聯(lián)檢Joint Inspection conducted

7. 聯(lián)檢完畢Joint Inspection completed

8. 等候潮水進(jìn)港Awaiting tide for entry

9. (從引水站)駐往裝、卸泊位Proceeding to berth for loading/discharging

10. 從錨駛往裝/卸泊位Heaved up (Weighed) anchor and proceeded to berth for loading/discharging

11. 駛靠第X號(hào)碼頭Proceeded & berthed alongside wharf NO

12. 從浮筒移至裝/卸泊位Shifting from buoys to loading/discharging berth

13. 船系XX號(hào)浮筒Moored at buoys NO

14. 因…不能進(jìn)港Failed to enter due to

15. 因…返回錨地Turned back to anchorage due to

 

二、裝卸準(zhǔn)備

1.準(zhǔn)備裝卸Preparation for loading/discharging

2.首末次開蓋艙First opening& final closing of hatches

3.整理吊桿 Rigging derricks.

4.清掃艙(船員/工人清掃)Cleaning holds (by crew members/shore labors)

5.鋪墊艙 Dunnaging and matting

6.水密檢驗(yàn)通過 Water tight test passed

7.接油管 Connecting oil pipes

8.拆油管 Disconnecting pipes

9.搭雨蓬 Erecting rain tents

10.拆雨蓬 Taking off rain tents

11.搭防動(dòng)設(shè)備 Erecting grain fitting (at hatch NO)

12.搭防動(dòng)板 Erecting shifting boards(at hatch No)

13.拆防動(dòng)板 Dismantling shifting boards(at Hatch No)

14.工人上船做準(zhǔn)備 Stevedore boarded for preparation of holds

15.商檢人員上船驗(yàn)艙 Cargo Surveyors boarded for inspection of holds

16.驗(yàn)檢不合格 Inspection of holds not passed

17.驗(yàn)艙合格 Inspection of holds

18.X艙商檢合格 Hold No. X inspection passed

19.全部貨艙通過 All holds inspection passed

20.安放漏斗 Erecting feeders

 

三、裝卸作業(yè)

1. 開始安裝 Loading/discharging commenced

1. 繼續(xù)安裝 Loading/discharging continued

2. 恢復(fù)裝卸 Loading/discharging resumed

3. 暫停裝卸 Loading/discharging suspended

4. 在雨蓬下裝卸 Loading/discharging under rain tents

5. 開幾條路(幾個(gè)頭)裝卸 Loading/discharging with gangs

6. 裝卸完畢 Loading/discharging completed

7. 公估 Determine the quantity of cargo loaded by draft survey

8. 卸地腳 Discharging cargo sweepings

9. (特殊)平艙 (Special)trimming of cargo

10. 掃艙 Sweeping holds

11. 等駁船 (車皮) Awaiting lighters/wagons

12. 等加載 Awaiting arrangement for additional cargo

13. 等待租方裝貨安排 Awaiting Charters loading arrangement

14. 等待租方裝貨安排 Awaiting shifting

15. 等候艙口照明 Awaiting cargo lights

16. XX原因裝/卸暫停 No work (Loading/discharging suspended) due to

 

 

四、 裝卸時(shí)間

1. 遞交NOR Notice of  Readiness tendered

2. 接受NOR Notice of  Readiness accepted

3. 收到NOR Notice of  Readiness received

4. 開始計(jì)算時(shí)間 Time commenced received

5. 用于裝/卸的時(shí)間 Time used for loading/discharging

6. 不計(jì)時(shí)間 Time not to count

7. 按租約不計(jì)時(shí)間 Time not to count

8. 扣除1/5時(shí)間 Time deducted by 1/5

9. 星期日不計(jì)時(shí)間 Time not count on Sunday

10. 元旦、春節(jié)、“五一”、國慶節(jié)不計(jì)時(shí)間 New Years Day/Spring Festival/May day/National Day of Peoples Republic of China, time not Count

11. 星期六下午不計(jì)時(shí)間 Saturday afternoon, time not to count

12. 例假日前一天XX時(shí)不計(jì)時(shí)間 The day before holiday, time not to count afterhours

13. 例假后一天8小時(shí)前不計(jì)時(shí)間 The day after holiday, time not to count before 8 a. m

14. 星期一8時(shí)起前不計(jì)時(shí)間 Monday, time not to count before a.m

15. 星期一從8時(shí)起算時(shí)間 Monday, time to count from 8.am

16. 冷卻吸揚(yáng)機(jī)時(shí)間 Time for cooling the motor of sucker

17. 裝卸重貨時(shí)間 Time not to count for loading/discharging heavy lifts

18. 雨蓬下裝卸不計(jì)時(shí)間 Loading/discharging under rain tents, time not to count

19. 雨蓬下裝卸,時(shí)間按50%計(jì)算 Loading/discharging under rain tents, time 50% to count

五、 因氣象、船舶屬具原因停工

1. 因雨停工 Suspended loading/discharging due to rain/snow

2. 因間斷下雨停工 Suspended loading/discharging due to intermittent rain

3. 因防下雨停工 Suspended loading/discharging due to precaution against rain

4. 天快下雨 Suspended loading/discharging due to threatening weather

1. 因霧停工 Suspended loading/discharging due to fog

2. 因雪停工 Suspended loading/discharging due to snow

3. 因大風(fēng)、臺(tái)風(fēng)停工 Suspended loading/discharging due to strong wind/typhoon

4. 因氣候不良停工 Suspended loading/discharging due to bad weather

5. 因潮水上碼頭停工 Suspended loading/discharging due to tide flooding over the wharf

6. 因臺(tái)風(fēng)信號(hào)升掛停工 Suspended loading/discharging due to hoisting of typhoon warning signal

7. 因港口受臺(tái)風(fēng)影響而停工 Suspended loading/discharging due to the port affected by typhoon

8. 臺(tái)風(fēng)警報(bào)解除Typhoon Alarm released

9. 因掃溝水停工 Suspended loading/discharging due to sweeping of the bildge

10. 因掃雪停工 No work due to sweeping of snow

11. 移至…避風(fēng) Shifting tofor taking shelter against typhoon/storm

12. X艙因絞車故障停工 Loading/discharging  suspended in hatch NODue to winch breakdown(trouble)

13. X艙因吊貨鋼絲故障停工 Loading/discharging suspended in Hatch NODue to cargo Runner trouble.

14. X艙因硬尾繩故障停工 Loading/discharging suspended in hatch NODue to winch breakdown(trouble)

15. X艙因貨燈故障停工 Loading/discharging Suspended in hatch NODue to failure of cargo light

16. X艙更換滑輪停工 Loading/discharging Suspended in hatch Noowing to replacing of block

17. X艙因更換鋼絲繩停工 Loading/discharging Suspended in hatch NOowing to replacing of cargo runner

18. 因蒸汽不足停工 Suspended loading/discharging due to insufficient Steam

19. 因船舶停電停工 Suspended loading/discharging due to suspension of ships power

20. 因燈光不足停工 Suspended loading/discharging due to insufficient light

21. 因主機(jī)(輔機(jī))故障停工 Suspended loading/discharging due to warping the ship forward/astern

22. 因油泵故障停工 Suspended loading/discharging due to main engine(auxiliary engine)trouble

23. 因船往前(后)絞泊停工Suspended Loading/discharging due to warping the ship forward astern

24. 因調(diào)整前后吃水停工 Suspended Loading/discharging due to adjusting drafts

25. 因修改積載圖停工 Suspended loading/discharging due to revising Stowage Plan

四、 船舶動(dòng)態(tài)

1. 由于低潮往外拉 Ship being kept off from due to low water

2. 船舶回靠碼頭(指重新靠碼頭)Ship hard up against wharf

3. 移泊 Shifting fromwharf(buoys)towharf(buoys)

4. 前后通擋若干尺(沿碼頭前后移動(dòng))Warping forward/asternft alongside the wharf

五、 熏蒸

1. 植檢人員(植物檢驗(yàn)人員)發(fā)現(xiàn)艙內(nèi)有蟲 Insects found in all holds by

Surveyors/Plant Quarantine Inspectors

2. 商檢人員口頭通知熏蒸Cargo fumigation as per Surveyors notice

3. 商檢人員正式通知熏蒸 Cargo fumigation as per Surveyors official order

4. 船移泊熏蒸 Shifting from wharf NOto buoys NO. for fumigation

5. 準(zhǔn)備熏蒸 Preparation for fumigation

6. 投藥 Chemical gas applied

7. 船熏蒸 Fumigation conducted

8. 放毒氣 Poisonous gas released

9. 船舶安全 Vessel found in safe condition

四、 油區(qū)裝卸

1. 排放壓艙水 Disballasting

2. 接管線 Connecting pipe lines/hoses

3. 驗(yàn)艙   Surveying tanks

4. 開泵   Pumping completed

5. 掃管線(清洗管線) Pipe Lines/Hoses blowing

6. 拆管線 Disconnecting pipe lines/hoses

7. 自流 Self flowing with residue pressure

 

    本站是提供個(gè)人知識(shí)管理的網(wǎng)絡(luò)存儲(chǔ)空間,所有內(nèi)容均由用戶發(fā)布,不代表本站觀點(diǎn)。請注意甄別內(nèi)容中的聯(lián)系方式、誘導(dǎo)購買等信息,謹(jǐn)防詐騙。如發(fā)現(xiàn)有害或侵權(quán)內(nèi)容,請點(diǎn)擊一鍵舉報(bào)。
    轉(zhuǎn)藏 分享 獻(xiàn)花(0

    0條評論

    發(fā)表

    請遵守用戶 評論公約

    類似文章 更多